Tagged: 

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #52265
    Nathan Lemacher

      Hello,

      We are currently looking into Microvellum and I am wondering if anyone uses the MV Link that could verify if the link brings in the optimized sheet counts when transferring back to ShopPAK? When you generate your work order in Microvellum and run the optimizer for that work order is that work order what the MV Link is then pulling from when transferring to ShopPAK?

    Viewing 1 post (of 1 total)
    • You must be logged in to reply to this topic.